Choose Product
Select your product, size, and add-ons that best match your needs.
Select your product, size, and add-ons that best match your needs.
Upload your artwork or request design assistance before placing your order.
Complete checkout, receive a proof, and approve the final artwork.
We print your approved order and ship it directly to your doorstep.
The 3x3m Booth Kit with S-Curve Wall & Sloped Arch, Counter & TV gives you a complete display for a 3m wide booth. It combines an S shape wall, a sloped arch wall, a rectangle counter, a shelf stand, a TV mount and clamping LED lights. Graphics are dye sublimation printed on 260gsm polyester, with single or double sided options. The frames assemble without tools and pack into soft nylon carry bags.
Full colour CMYK print on 260gsm polyester, single or double sided
Wrinkle resistant, fire retardant polyester with a zip lock at the bottom
Tool free assembly with two wide steel bases
S shape wall, sloped arch, counter, shelf stand, TV mount and LED lights
| Size | Frame | Graphic | Package Dimensions |
|---|---|---|---|
| S shape display, 1m W x 2.7m H | 1m W x 2.7m H | 1000mm W x 2580mm H | 27cm x 27cm x 74cm |
| Sloped arch display, 2m W x 2.5m H | 2m W x 2.3m to 2.5m H | 2000mm W x 2280mm to 2524mm H | 65cm x 35cm x 10cm (1 piece) |
| Rectangle counter, 0.8m W x 1m H x 0.5m D | 0.8m W x 1m H x 0.5m D | 2200mm W x 1025mm H | 84cm x 12cm x 58cm |
Product Specifications:
Note: The kit includes a TV mount only. A TV is not included. Choose single side or double side graphics under the printing option.
You can upload your artwork on the website if the file is under 50MB. For larger files, use WeTransfer, Dropbox or Google Drive and share the URL with us. Any artwork size is accepted.
If you do not have a design ready, use our free design service. Email us your designs or ideas and we will replicate them for you.
| Category | Specification |
|---|---|
| Accepted Formats | .eps, .png, .jpg, .bmp, .gif, .psd, .cdr, .pdf, .tif, .tiff, .ppt, .ai |
| Resolution | 150 dpi at 100% of the final print size |
| Bleed | No bleed and no crop marks |
| Fonts | Outlined fonts only |
| Photoshop Files | Provide a flattened file only |